+44(0)151 236 8094

Construction Update – Manchester Waters – May 2019

29th May 2019

Works to the Manchester Waters site are underway with the intumescent paint to Block A ongoing and the installation works of windows to levels 1 & 2 continue. A site survey has been carried out to the existing pumping station, associated manholes and ground conditions.

Back to blog

Our latest projects

View all projects